Jump to navigation   Jump to search   Jump to main content  
×
☰ Menu

Application Number: DA2018/1146


Description:
Change of Use - Alterations and Additions and Use of Premises as a Health Consulting Room
Application Type:
Development Application
Status:
Withdrawn
Submitted:
05/07/2018
Exhibition Period:
12/07/2018 to 30/07/2018
Determined:
14/05/2019
Determination Level:
Council Staff
Cost of Work:
$ 275,000
Officer:
Julie Edwards
Submissions:

Related Applications:
There are no related applications.
Map

Other Applications
Development Application DA2018/1146
Alterations and Additions and Use of Premises as a Health Consulting Room (Submitted: 05/07/2018)
Converted Fujitsu MOD2001/0052/1
Modification to Allow Use of Colorbond Off-Whte Roof - (Submitted: 17/04/2001)
Converted Fujitsu DA2001/0052
Proposed Eclipse Rotating Louvre Patio Cover With Open Pergola (Submitted: 22/01/2001)
Converted Fujitsu DA2000/4947
Boundary Fence (Submitted: 21/09/2000)
Converted Fujitsu BA5003/7402
Add N DATE TYPE NOTE 29/09/1998 Frame Inspected by: DR Notes: OK (Submitted: 24/04/1998)
Converted Fujitsu BA5003/2423
Add N DATE TYPE NOTE 05/08/1996 Final Inspected by: DB Notes: SATISFACTORY 01/08/1996 Final Inspected by: DB Notes: SATISFACTORY (Submitted: 04/03/1996)
Converted Fujitsu BA5003/1890
Add N DATE TYPE NOTE 16/08/1996 Final Inspected by: DG Notes: UNSATISFACTORY 23/05/1996 wet area Flashings Inspected by: DG Notes: SATISFACTORY 15/04/1996 Frame Inspected by: GM1 Notes: SATISFACTORY 12/04/1996 Frame Inspected by: GM Notes: SATISFACTORY 14/05/2001 Final OK SATISFACTORY (Submitted: 05/12/1995)
Converted Fujitsu BA5002/8964
Add N DATE TYPE NOTE 01/12/1994 Pool Fencing Inspected by: JB Notes: UNSATISFACTORY 01/12/1994 Pool Steel Inspected by: JB Notes: SATISFACTORY (Submitted: 19/09/1994)
Converted Fujitsu BA5002/3506
Add N (Submitted: 03/11/1993)
Converted Fujitsu BA5001/1582
Add N DATE TYPE NOTE 02/10/1990 Final Inspected by: SO Notes: SATISFACTORY 02/10/1990 Stormwater Inspected by: SO Notes: SATISFACTORY 24/09/1990 Final Inspected by: SO Notes: TO CONNECT ALL GUTTERS & DOWNPIPES 03/05/1990 Frame Inspected by: SO Notes: SATISFACTORY 24/04/1990 Bearers and Joists 1st Floor Inspected by: SO Notes: SATISFACTORY 29/03/1990 Footings Inspected by: SO Notes: SATISFACTORY 29/03/1990 Steel Inspected by: SO Notes: SATISFACTORY 28/03/1990 Footings Inspected by: SO Notes: INCOMPLETE (Submitted: 13/02/1990)
Converted Fujitsu BA5001/0862
Add N DATE TYPE NOTE 20/03/1990 Final Inspected by: SO Notes: SATISFACTORY (Submitted: 23/11/1989)