Jump to navigation   Jump to search   Jump to main content  
×
☰ Menu

Application Number: DA2023/0314


Description:
Alterations and additions to residential developmt - Alterations and additions to a dwelling house
Application Type:
Development Application
Status:
Approved
Submitted:
29/03/2023
Exhibition Period:
06/04/2023 to 20/04/2023
Determined:
25/08/2023
Determination Level:
Council Staff
Cost of Work:
$ 377,300
Officer:
Michael French
Submissions:

Map

Other Applications
Principal Certifier NOC2025/0223
Alterations and additions to a dwelling house (Submitted: 25/02/2025)
Principal Certifier PCA2025/0005
The proposed development is for a second storey addition to increase the number of bedrooms and bathrooms and to create a second separate living space, as is commonplace in large family homes. The proposed new floor is within the footprint of the existing dwelling; consequently, there is no anticipated impact to the established gardens, shrubs and trees. The finished two storey dwelling and the property as a whole will be in character with the surrounding properties and the natural environment of the area. (Submitted: 17/02/2025)
Construction Certificate CC2024/0641
First floor additions to an existing dwelling (Submitted: 19/06/2024)
Section 455 Modifications Mod2024/0112
Modification of Development Consent DA2023/0314 granted for Alterations and additions to a dwelling house (Submitted: 18/03/2024)
Development Application DA2023/0314
Alterations and additions to a dwelling house (Submitted: 29/03/2023)
Principal Certifying Authority FOC2018/1633
Installation of a pre fabricated swimspa and construction of an awning (Submitted: 05/12/2018)
Complying Development Certificate CDC2015/0645
Installation of a pre fabricated swimspa and construction of an awning (Submitted: 30/11/2015)
Converted Fujitsu BA5003/6396
Add N (Submitted: 26/11/1997)
Converted Fujitsu BA5003/1068
Add N DATE TYPE NOTE 17/06/1998 Frame Inspected by: MW Notes: ENGR.CERT.RECEIVED 27/03/1997 Slabs Inspected by: GM1 Notes: SATISFACTORY 02/01/1997 Bearers and Joists 1st Floor Inspected by: GM1 Notes: SATISFACTORY 23/08/1996 Footings Inspected by: GM1 Notes: INCOMPLETE 27/08/1996 Footings Inspected by: JB Notes: SATISFACTORY (Submitted: 03/08/1995)