Principal Certifier FOC2019/1024
Construction of new swimming pool - FOC18008/01
(Submitted: 14/02/2019)
Complying Development Certificate CDC2018/0773
Construction of new swimming pool - CDC18008/01
(Submitted: 21/08/2018)
Converted Fujitsu MOD2000/4180/2
Modification - Deletion of Condition 16 of DA Consent 2000/4180 Relating to the Design of Upstairs Bathroom Window -
DATE TYPE NOTE
05/01/2001 Envelope SATISFACTORY BUT SUBJECT TO CONDITIONS-ENGINEERS CERTIFICATE REQUIRED FOR INSPECTIONS AT VARIOUS STAGES
25/08/2000 Preliminary SATISFACTORY BUT SUBJECT TO CONDITIONS-ENGINEERS CERTIFICATE REQUIRED FOR INSPECTIONS AT VARIOUS STAGES
(Submitted: 07/04/2003)
Converted Fujitsu DA2000/4180
First Floor Addition - Roof Conversion - Rigoni G
DATE TYPE NOTE
05/01/2001 Envelope SATISFACTORY BUT SUBJECT TO CONDITIONS-ENGINEERS CERTIFICATE REQUIRED FOR INSPECTIONS AT VARIOUS STAGES
25/08/2000 Preliminary SATISFACTORY BUT SUBJECT TO CONDITIONS-ENGINEERS CERTIFICATE REQUIRED FOR INSPECTIONS AT VARIOUS STAGES
(Submitted: 19/04/2000)
Converted Fujitsu MOD2000/4180/1
Study Section of the First Floor Addition Has Raised 130MM to Accomodate Structural Engineers Requirments for the Floor Joist.Step Down from the Study to Gallery Section Will Ensure Neighbours Privacy Request.
DATE TYPE NOTE
05/01/2001 Envelope SATISFACTORY BUT SUBJECT TO CONDITIONS-ENGINEERS CERTIFICATE REQUIRED FOR INSPECTIONS AT VARIOUS STAGES
25/08/2000 Preliminary SATISFACTORY BUT SUBJECT TO CONDITIONS-ENGINEERS CERTIFICATE REQUIRED FOR INSPECTIONS AT VARIOUS STAGES
(Submitted: 19/04/2000)
Converted Fujitsu BA5002/2900
Add N
DATE TYPE NOTE
15/07/1999 Final Inspected by: RD Notes: OK
02/05/1994 Frame Inspected by: AC Notes: SATISFACTORY
01/04/1994 Frame Inspected by: AC Notes: SATISF
07/10/1993 Slabs Inspected by: AC Notes: SATISFACTORY
(Submitted: 30/08/1993)