Application Number: Mod2020/0580


Description:
Section 455 Private - CDC - Modified CDC: Addition of 7 new toilets in the female toilets and I accessible toilet - this approval is an adjustment to a door relating to accessibility - GDL190142.2
Application Type:
Section 455 Modifications
Status:
Completed
Submitted:
03/11/2020
Cost of Work:
$ 0
Officer:

Submissions:

Related Applications:
Map

Other Applications
Principal Certifier OC2023/0632
Adjustments to the Junior School Handrail Safety Upgrade; Undercover walkway from Multipurpose Hall to the Junior school; Additional play equipment to the Junior school landscape; Adjustments to Music rooms (beneath multipurpose hall), Boy's change room to be modified to toilets and new oval toilets - GDL220449 (Submitted: 13/07/2023)
Complying Development Certificate CDC2023/0401
Modification to Adjustments to the Junior School Handrail Safety Upgrade; Undercover walkway from Multipurpose Hall to the Junior school; Additional play equipment to the Junior school landscape; Adjustments to Music rooms (beneath multipurpose hall), Boy's change room to be modified to toilets and new oval toilets - GDL220449.1 (Submitted: 16/06/2023)
Principal Certifier OC2023/0375
Adjustments to the Junior School Handrail Safety Upgrade; Undercover walkway from Multipurpose Hall to the Junior school; Additional play equipment to the Junior school landscape; Adjustments to Music rooms (beneath multipurpose hall), Boy's change room to be modified to toilets and new oval toilets - GDL220449 (Submitted: 24/04/2023)
Complying Development Certificate CDC2022/1251
Adjustments to the Junior School Handrail Safety Upgrade; Undercover walkway from Multipurpose Hall to the Junior school; Additional play equipment to the Junior school landscape; Adjustments to Music rooms (beneath multipurpose hall), Boy's change room to be modified to toilets and new oval toilets - GDL220449 (Submitted: 05/12/2022)
Principal Certifier NOC2022/1327
Adjustments to the Junior School Handrail Safety Upgrade; Undercover walkway from Multipurpose Hall to the Junior school; Additional play equipment to the Junior school landscape; Adjustments to Music rooms (beneath multipurpose hall), Boy's change room to be modified to toilets and new oval toilets - GDL220449 (Submitted: 05/12/2022)
Principal Certifier FOC2022/0047
Proposed refurbishment of existing Administration and TAS area - GDL210034 (Submitted: 08/02/2022)
Complying Development Certificate CDC2021/1220
MOD CDC: Proposed refurbishment of existing Administration and TAS areas - GDL210034.1 (Submitted: 06/12/2021)
Complying Development Certificate CDC2021/0852
Proposed refurbishment of existing Administration and TAS area - GDL210034 (Submitted: 02/09/2021)
Principal Certifier NOC2021/1094
Proposed refurbishment of existing Administration and TAS area - GDL210034 (Submitted: 02/09/2021)
Principal Certifier FOC2021/0019
Science and technology strip out of existing building to create science lab and 2 x food tech rooms. On ground floor, new classrooms and student spaces on L1 & L2 & new paving to external area. Link Building: demolition and replacement of existing stair with new stair, study area and expansion of the staff area on L1 & L2. Include an adjustment to the wall between the Link Building and Science and Technology Building, along with the removal of ladder to roof and replacement with access hatch - GDL190142 (Submitted: 30/12/2020)
Section 455 Modifications Mod2020/0580
Modified CDC: Addition of 7 new toilets in the female toilets and I accessible toilet - this approval is an adjustment to a door relating to accessibility - GDL190142.2 (Submitted: 03/11/2020)
Principal Certifier FOC2020/1635
St Luke's Grammar New Junior School Building - GDL180084 for GDL180084, GDL180084.1, GDL180084.2 & GDL180084.3 (Submitted: 30/09/2020)
Section 455 Modifications Mod2020/0448
MODIFIED CDC: Science and technology refurbishment to the existing school - Link Building. demolition and replacement of existing stair with new stair, study area and expansion of the staff area on L1 and L2. Female toilets - addition of 7 new toilets in the female toilets and 1 accessible toilet - THIS approval is for an adjustment to the wall between the Link Building and Science & Technology Building, along with the removal of ladder to roof and replacement with access hatch - GDL190142.1 (Submitted: 10/09/2020)
Principal Certifier IOC2020/0087
Whole Building including basement level except landscaping (along quirk & headland road) - GDL180084 (Submitted: 09/07/2020)
Section 455 Modifications Mod2020/0243
MODIFIED (2) - St Luke's Junior School Redevelopment - GDL180084.3 Corrected copy. (Submitted: 11/06/2020)
Section 455 Modifications Mod2020/0235
Modified CDC - St Luke's Junior School Redevelopment - GDL180084.3 (Submitted: 29/05/2020)
Principal Certifier IOC2020/0024
Science and technology refurbishment to the existing school - GDL190142 (Submitted: 05/02/2020)
Section 455 Modifications Mod2020/0015
St Luke's Junior School Redevelopment - GDL180084 - Please refer to CDC2018/1200 - GDL180084 (Submitted: 17/01/2020)
Complying Development Certificate CDC2019/0945
Science and technology refurbishment to the existing school - GDL190142 (Submitted: 06/12/2019)
Principal Certifier NOC2019/1504
Science & Technology refurbishment to the existing school - GDL190142 (Submitted: 04/12/2019)
Section 455 Modifications Mod2019/0298
St Luke's Junior School Redevelopment - GDL180084 - Please refer to CDC2018/1200 (Submitted: 21/06/2019)
Section 455 Modifications Mod2018/0701
Modified CDC - St Luke's Junior School Redevelopment - GDL180084.1 (Submitted: 17/12/2018)
Complying Development Certificate CDC2018/1220
St Luke's Junior School Redevelopment - GDL180084 - Please refer to CDC2018/1200 (Submitted: 12/12/2018)
Principal Certifier NOC2018/1800
St Luke's Junior School Redevelopment (Submitted: 12/12/2018)
Complying Development Certificate CDC2018/1200
St Luke's Junior School Redevelopment - GDL180084 (Submitted: 10/12/2018)
Section 455 Modifications Mod2018/0412
Modification of Development Consent DA2011/0446 granted for Alterations and additions to a school to increase student numbers (Submitted: 07/08/2018)
Principal Certifier FOC2017/0527
Alterations and additions to an Educational Establishment (Submitted: 14/08/2017)
Principal Certifier FOC2017/0520
Refurbishment of library adjacent toilets on level 3 - level 3 administration building in Headland Rd - GDL160531 - Group DLA (Submitted: 11/08/2017)
Principal Certifier FOC2017/0513
Private SEPP - Refurbishment of existing school multi purpose hall including installation of new air conditioning (Submitted: 10/08/2017)
Section 455 Modifications Mod2017/0211
MOD - Refurbishment of library adjacent toilets on level 3 - level 3 administration building in Headland Rd - GDL160531 - Group DLA - This approval relates to Fire Engineering Report No 2016117 issued by Fire Engineering Design for mezzanine level of library only. (Submitted: 09/08/2017)
Complying Development Certificate CDC2017/0402
Refurbishment of existing school multipurpose hall inc installation of new air conditioning - New alternative solution for smoke detection the main hall area & new alternative solution for the Omission of fire rating at Level 4 of Fire Stair 5 (Submitted: 10/07/2017)
Complying Development Certificate CDC2017/0188
Refurbishment of library adjacent toilets on level 3 - level 3 administration building in Headland Rd - GDL160531 - Group DLA (Submitted: 07/04/2017)
Principal Certifier NOC2017/0256
Refurbishment of library adjacent toilets on level 3 - level 3 administration building in Headland Rd - GDL160531 - Group DLA (Submitted: 07/04/2017)
Section 455 Modifications Mod2017/0071
Modification of Development Consent DA2011/0446 granted for Alterations and additions to a school (St Lukes Grammar School) (Submitted: 28/03/2017)
Section 455 Modifications Mod2016/0325
Modification of Development Consent DA2011/0446 granted for Alterations and additions to a school (Submitted: 12/12/2016)
Complying Development Certificate CDC2016/0183
Private SEPP - Refurbishment of existing school multi purpose hall including installation of new air conditioning (Submitted: 06/04/2016)
Principal Certifier NOC2016/0207
Private SEPP - Refurbishment of existing school multi purpose hall including installation of new air conditioning (Submitted: 06/04/2016)
Construction Certificate CC2016/0164
Alterations and additions to an Educational Establishment (Submitted: 01/04/2016)
Principal Certifier NOC2016/0271
Alterations and additions to an Educational Establishment (Submitted: 01/04/2016)
Complying Development Certificate CDC2014/0392
Business Premises - refurbishment of junior school administration offices,toilets,lifts and walkways (Submitted: 18/08/2014)
Construction Certificate CC2014/0414
Alterations and Additions to an Educational Establishment and Signage (Submitted: 18/08/2014)
Principal Certifier PCA2014/0750
Business Premises - refurbishment of junior school administration offices,toilets,lifts and walkways (Submitted: 15/08/2014)
Principal Certifier PCA2014/0752
Alterations and Additions to an Educational Establishment and Signage (Submitted: 14/08/2014)
Section 455 Modifications Mod2014/0064
Modification of Development Consent DA2013/1489 granted for Alterations and Additions to an Educational Establishment and Signage (Submitted: 10/04/2014)
Development Application DA2013/1525
Alterations and additions to an Educational Establishment (Submitted: 20/12/2013)
Development Application DA2013/1489
Alterations and Additions to an Educational Establishment and Signage (Submitted: 11/12/2013)
Development Application DA2013/0661
Alterations and additions to an Educational Establishment and signage (Submitted: 06/06/2013)
Section 455 Modifications Mod2012/0210
Modification of Development Consent DA2003/1728 granted for Alterations and additions to St Luke’s Grammar School for a proposed middle school, junior school entry, senior common room and staff facilities (Submitted: 17/10/2012)
Principal Certifier PCA2011/1059
Amendment to Infrastructure Project Application No. 09/0174 - Construction of new building consisting of two level basement car park, classrooms and playing courts - St Lukes Grammar School (Submitted: 05/10/2011)
Construction Certificate CC2011/0802
Alterations and additions to a school (Submitted: 27/09/2011)
Principal Certifier PCA2011/1060
Alterations and additions to a school - Interim Occupation Cerificate for Senior School West Wing Ground & First Floor & South Wing First Floor. (Submitted: 27/09/2011)
Development Application DA2011/0446
Alterations and additions to a school (Submitted: 04/04/2011)
Construction Certificate CC2011/0218
Erection of signage at St Lukes Grammar School (Submitted: 28/03/2011)
Principal Certifier PCA2011/0262
Erection of signage at St Lukes Grammar School (Submitted: 25/03/2011)
Government Advice FG2010/0011
Amendment to Infrastructure Project Application No. 09/0174 - Construction of new building consisting of two level basement car park, classrooms and playing courts - St Lukes Grammar School (Submitted: 23/02/2010)
Development Application DA2009/0678
Erection of signage at St Lukes Grammar School (Submitted: 29/05/2009)
Development Application DA2009/0177
Staged development for the redevelopment of the existing school including stage 1 works (Submitted: 17/02/2009)
Converted Fujitsu MOD2003/1728/1
Modification of Development Consent No. 2003/1728DA Proposing the Deletion of Condition NO.17 and 48(I) Relating to Protectionof Windows (Submitted: 28/04/2005)
Converted Fujitsu MOD2004/0646/1
Modification to re-Locate Temporary Buildings and Minor Internal Changes to Temporary Buildings (Submitted: 10/11/2004)
Converted Fujitsu DA2004/0646
Erection of Portable Buildings - (classrooms 10 Single Storey 1 Double Storey Admin & Toilet Block St Lukes Grammar School) If $480, Es $825, LSL $244,to Pay for CC; (Submitted: 21/05/2004)
Converted Fujitsu DA2003/1728
Upgrade of Junior School Entry Erection of a New Middle School & New Senior Common Room Renotified Traffic Management Plan 4/11/04 to 22/11/04 Es $10,000, Env $60, LSL $6000, IF Tba, Pca $3622 Applicant to Pick UP 13/12/04 St Luke's Grammar School (Submitted: 19/12/2003)
Converted Fujitsu DA2001/1143
A New Uniform Shop.Amendments to Music Practice Rooms ALL Within Existing Building. (Submitted: 21/08/2001)
Converted Fujitsu DA2001/0831
New Musical Practice Rooms Under Existing Hall (Submitted: 28/06/2001)
Converted Fujitsu DA2001/0832
Relocation of Canteen to Existing Uniform Shop (Submitted: 28/06/2001)
Converted Fujitsu DA2001/0833
Demolition of Classroom & Canteen (Submitted: 28/06/2001)
Converted Fujitsu MOD1998/0272/2
Minor Amendment to the Footprint of the Proposed Senior Resource Centre DATE TYPE NOTE 29/09/2000 Final Not OK THE CERTIFICATE WAS NOT ABLE TO BE ISSUED FOR THE FOLLOWING REASONS - PLEASE SEE THE FILE FOR COMMENTS (Submitted: 10/08/2000)
Converted Fujitsu MOD1998/0272/1
School- Demolition & Erection New Building - St Lukes Anglican School DATE TYPE NOTE 29/09/2000 Final Not OK THE CERTIFICATE WAS NOT ABLE TO BE ISSUED FOR THE FOLLOWING REASONS - PLEASE SEE THE FILE FOR COMMENTS (Submitted: 07/02/2000)
Converted Fujitsu DA1998/1031
Demountable Classroom Block - St Lukes Anglican School Limited (Submitted: 08/12/1998)
Converted Fujitsu DA1998/0272
School- Demolition & Erection New Building - St Lukes Anglican School DATE TYPE NOTE 29/09/2000 Final Not OK THE CERTIFICATE WAS NOT ABLE TO BE ISSUED FOR THE FOLLOWING REASONS - PLEASE SEE THE FILE FOR COMMENTS (Submitted: 19/08/1998)
Converted Fujitsu DA1998/0200
School-Enclosure of School Uniform-Shop & Music Practice Room DATE TYPE NOTE 23/06/1999 Frame Inspection 19/05/1999 Final OK FINAL (Submitted: 03/08/1998)
Converted Fujitsu BA5003/2223
Add N DATE TYPE NOTE 03/12/1996 Occupation Inspected by: MG Notes: SATISFACTORY 02/07/1996 Steel Inspected by: MG Notes: ENGINEER TO CERTIFY 28/06/1996 Steel Inspected by: MG Notes: SATISFACTORY 31/05/1996 Piers Inspected by: MG Notes: SATISFACTORY-HOLES (Submitted: 25/01/1996)
Converted Fujitsu BA5000/0099
ADD Carpark N (Submitted: 08/07/1987)
Development Application DA2024/1288
Educational Establishment - Expansion of St Luke’s Grammar School to two new sites under Significant State Development Approval SSD 10291