Construction Certificate CC2023/0225
Construction of a driveway, passing bay and two hardstand parking areas. All building works are only for work contained in the lot 2 DP18022
(Submitted: 28/02/2023)
Development Application DA2021/0953
Demolition works and subdivision of one lot into two lots
(Submitted: 30/06/2021)
Converted Fujitsu BA5003/2682
Add N
DATE TYPE NOTE
28/08/1996 Final Inspected by: VM Notes: SATISFACTORY
18/07/1996 wet area Flashings Inspected by: VM Notes: SATISFACTORY
02/07/1996 Wall Frame Inspected by: VM Notes: SATISFACTORY (ROOF FRAME)
(Submitted: 18/04/1996)
Converted Fujitsu BA5000/0826
New N
DATE TYPE NOTE
04/07/1988 Stormwater Inspected by: VM Notes: SATISFACTORY
22/03/1988 Footings Inspected by: JB Notes: SATISFACTORY
(Submitted: 08/09/1987)