Health and Building Certificates BC2020/0201
Unauthorised 'As Built' patio, pergola and laundry attached to outbuilding.
30/01/2021 - 40 day deferral letter issued (RW)
(Submitted: 16/10/2020)
Development Application DA2020/0052
Alterations and additions to a dwelling house including a secondary dwelling
(Submitted: 22/01/2020)
Converted Fujitsu DA2001/1197
Proposed Outbuilding to Be Used as Gymnasium,billard Room,to Rear Yard of Existing Residence.Recreation Purposes ,billiard Room,gymnasium,shower Room
(Submitted: 29/08/2001)
Converted Fujitsu BA5003/0472
Add N
DATE TYPE NOTE
19/02/1996 Frame Inspected by: CS Notes: SATISFACTORY
05/02/1996 Floor Joists Inspected by: CS Notes: SATISFACTORY (1ST FLOOR)
(Submitted: 02/05/1995)